Page 4 of 6 FirstFirst 123456 LastLast
Results 31 to 40 of 57

Thread: Current US Government Shutdown and Export update.

  1. #31
    CGN Regular RKRZ's Avatar
    Join Date
    Dec 2015
    Location
    GTA
    Posts
    150
    Quote Originally Posted by mistero View Post
    I wonder how he was made or why he decided to go along this 3 week opening.
    Can't do his State of the Union address under a Govt shutdown.

  2. #32
    Member
    Join Date
    May 2012
    Location
    Edmonton
    Posts
    74
    Looks the the orange ape finally caved. Coulter is loosing her mind right now ��

  3. #33

  4. #34
    CGN frequent flyer tobin's Avatar
    Join Date
    Mar 2004
    Location
    MB
    Posts
    1,807
    Quote Originally Posted by Frank_d View Post
    Looks the the orange ape finally caved. Coulter is loosing her mind right now ��
    In fairness, he is only 50% orange haired orangutan. Coulter was loosing her sh!t big time over this big time on Bill Maher last night.
    Working towards Ultra Frequent Flyer status at a glacial pace!

  5. #35
    CGN Regular
    Join Date
    Jan 2015
    Location
    Ottawa
    Posts
    729
    Quote Originally Posted by Pumpjack View Post
    Keep dreaming, he knew he lost about a week ago when he was told not to show up for SOTU. In his (oh so) infinite wisdom and threatened to do the shutdown he built the cross he was going to be nailed to. The left played him and played him well and the final nail was saying they would give him the 5.7billion for border security but not for the wall. They manipulated him the whole way.

  6. #36
    CGN Regular Rotorwash's Avatar
    Join Date
    Aug 2013
    Location
    British columbia
    Posts
    206
    So does that mean products will start making their way across?

  7. #37
    CGN Ultra frequent flyer G37's Avatar
    Join Date
    Nov 2004
    Location
    Vancouver
    Posts
    5,111
    Total speculation on my end, but, since there was a 1-month shutdown, everything affected will probably be delayed by at least 2-months.

  8. #38
    CGN frequent flyer Jäger's Avatar
    Join Date
    Dec 2011
    Location
    Thornbury, Ontario
    Posts
    1,259
    Quote Originally Posted by G37 View Post
    Total speculation on my end, but, since there was a 1-month shutdown, everything affected will probably be delayed by at least 2-months.
    Assuming 1 month's productivity has been lost is assuming government employees fill their days doing actual work and not shuffling papers around, leaning on each other's desks, taking 1 hour dumps or having "network issues".
    Last edited by Jäger; 01-28-2019 at 06:30 AM.

  9. #39
    CGN Regular Crack's Avatar
    Join Date
    Mar 2005
    Posts
    151
    Trying to make a purchase online. When I go through all the hoops and finally try to check out, it says "Missing shipping information". It's all there and correct so what hoop do I need to jump through next?

  10. #40
    CGN Regular Crack's Avatar
    Join Date
    Mar 2005
    Posts
    151
    Quote Originally Posted by Crack View Post
    Trying to make a purchase online. When I go through all the hoops and finally try to check out, it says "Missing shipping information". It's all there and correct so what hoop do I need to jump through next?
    Disregard,

    I suddenly learnt how to red,

Page 4 of 6 FirstFirst 123456 LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •