Page 2 of 2 FirstFirst 12
Results 11 to 20 of 20

Thread: Our Last AR15

  1. #11
    Business Member Rep. ATRS Shaun's Avatar
    Join Date
    Jan 2015
    Location
    Calgary, AB
    Posts
    1,094
    Update: Sold out of AT15 stripped lower receivers. Only two AR15's left, short 7" CQB AT15 custom rifle, and a used Colt M4 Carbine.

  2. #12
    Business Member Rep. ATRS Shaun's Avatar
    Join Date
    Jan 2015
    Location
    Calgary, AB
    Posts
    1,094
    Update: Down to 1 last AT15 complete rifle.

  3. #13
    Member
    Join Date
    Sep 2015
    Location
    Chilliwack, BC
    Posts
    54
    I just placed an order for a upper/lower in the third production run. I payed the 50%...is that enough to be considered completed/finalized? If not, would paying the remaining amount now complete/finalize the order, or do I need to wait till production of my upper/lower is complete? I’d like to avoid the new BS rules and regulations if at all possible.

    Quote Originally Posted by ATRS Shaun View Post
    Added and subtracted relevant information.

    Modern Sporter's are still being sold, orders are being taken for the third production run. Any sales completed/finalized prior to C71 receiving royal assent will be treated as sales prior to C71... Any sales completed/finalized after C71 receives royal assent will be subject to whatever new rules and regulations are implemented (read as: shoved involuntarily down our throats).

  4. #14
    CGN Ultra frequent flyer Scotty454's Avatar
    Join Date
    May 2014
    Location
    Calgary
    Posts
    3,563
    Double post...
    Last edited by Scotty454; 07-19-2019 at 04:24 AM.

    Let Freedom Ring With a Shotgun Blast!

  5. #15
    CGN Ultra frequent flyer Scotty454's Avatar
    Join Date
    May 2014
    Location
    Calgary
    Posts
    3,563
    Quote Originally Posted by Ramnon View Post
    I just placed an order for a upper/lower in the third production run. I payed the 50%...is that enough to be considered completed/finalized? If not, would paying the remaining amount now complete/finalize the order, or do I need to wait till production of my upper/lower is complete? I’d like to avoid the new BS rules and regulations if at all possible.
    C71 has received royal ascent, and is now law. You're too late (by about a month), unfortunately.

    Let Freedom Ring With a Shotgun Blast!

  6. #16
    Uber Super GunNutz
    Join Date
    Mar 2017
    Posts
    3,618
    Quote Originally Posted by Scotty454 View Post
    C71 has received royal ascent, and is now law. You're too late (by about a month), unfortunately.
    Those transfer rules are not in effect, and likely will not be till after the election. Numerous threads on this I believe.
    "He who dares not offend, cannot be honest."
    - Thomas Paine

    "Oppression maketh a wise man mad"

  7. #17
    Business Member Rep. ATRS Shaun's Avatar
    Join Date
    Jan 2015
    Location
    Calgary, AB
    Posts
    1,094
    Quote Originally Posted by Ramnon View Post
    I just placed an order for a upper/lower in the third production run. I payed the 50%...is that enough to be considered completed/finalized? If not, would paying the remaining amount now complete/finalize the order, or do I need to wait till production of my upper/lower is complete? I’d like to avoid the new BS rules and regulations if at all possible.
    Quote Originally Posted by Scotty454 View Post
    C71 has received royal ascent, and is now law. You're too late (by about a month), unfortunately.
    Quote Originally Posted by Bfranklin View Post
    Those transfer rules are not in effect, and likely will not be till after the election. Numerous threads on this I believe.
    I spoke with the CFO for Alberta about a week ago and this is exactly what was told to me. The problem is, there's no guarantee, they can only say 'likely', and if you look at the infrastructure, they don't have any sort of a system developed to handle the task. Incredibly uncertain times, becausse C71 is now passed, it can come at any time. Most people 'in the know' (and I use that term loosely) don't think the government is going to act on it until after the election.

  8. #18
    Super GunNutz Sniffer's Avatar
    Join Date
    Jun 2016
    Location
    Okanagan
    Posts
    4,075
    Quote Originally Posted by Ramnon View Post
    I just placed an order for a upper/lower in the third production run. I payed the 50%...is that enough to be considered completed/finalized? If not, would paying the remaining amount now complete/finalize the order, or do I need to wait till production of my upper/lower is complete? I’d like to avoid the new BS rules and regulations if at all possible.
    If it were me I`d pay off the remainder now, that way your name won't find its way onto any C71 unofficial LGR lists.

  9. #19
    CGN Ultra frequent flyer jparent's Avatar
    Join Date
    Sep 2005
    Posts
    3,166
    Quote Originally Posted by ATRS Shaun View Post
    We have one complete AR15 which is a tiny little bastard.
    A 7.5" barreled, 24" overall, AT15 build for $2750.





    Edits: down to only 1 AT15 stripped lower left.
    Edits: Bushmaster lowers are sold out. AT15's down to 2 left. Added a colt M4 Carbine in 22lr.
    Edits: Colt M4 is sold.

    If you're still looking, give us a call 403-277-7786
    What handguard is that on the little guy?
    Looking down the barrel, of 1984...
    Foxtrot Uniform Charlie Foxtrot Oscar.
    It's too late to work within the system, but too early to shoot the bastards. - Claire Wolfe

  10. #20
    Member
    Join Date
    Sep 2015
    Location
    Chilliwack, BC
    Posts
    54
    Quote Originally Posted by Sniffer View Post
    If it were me I`d pay off the remainder now, that way your name won't find its way onto any C71 unofficial LGR lists.
    Ya, that’s what I’m thinking.

Page 2 of 2 FirstFirst 12

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •