The Mk2 at this point has all of the announced Mk3 upgrades less the "Dust Cover"/ Ejection Port Cover. Rather that sell rifles with minor "issues", JR Cox and SAI agreed to delay the production rifle in favour of rectifying the problems and simutaneously integrating as much of the Mk3 upgrades as possible. This gives purchasers of the rifle some upgrades that were never initially going to be offered with the Mk2, such as the adjustable Gas Block which is necessary for anyone contemplating a calibre change.
The adjustable Gas Blocks will be sent out free of charge to anyone purchasing one of the "Pencil Barrel" Rifles equipped with a Fixed Gas Block. That said, the intent is to stockpile sufficient spare parts that folks will be able to purchase any part that they want.
To clarify: The plan is to release about 40 rifles in total initially. this will be a mixture of MOE Grey, MOE FDE and Zhukov Folding (Blk). They will come out the same day at The Shooting Edge (Calgary) and Target Sports (Gormley)
These rifles all work as is, otherwise they would not be released ;-)
These will have the full pencil barrel, non-adjustable gas blocks and an aluminum cocking plate and standard guide rods.
In testing, we found that; if you dropped the guide rods "just right", the nitriding made them too fragile and they "could" crack or shear from the back plate.... Its an easy fix... don't drop them ;-)
Whomever buys these first limited rifles will get a free replacement back plate, guide rods, improved return springs and a steel cocking plate... all easy to swap, sent out automatically.
What you do not get is a new gas block. There really is zero reason to swap the gas block on the existing rifle as it works great. If you want an adjustable gas block, wait till February.
We have also asked SAI to sell us parts and they have agreed, so by mid-Jan, we should also have a complete listing of SAI parts on our websites and in-store. We will NOT be selling receiver sets at this time.
On a different note; we have asked SAI to also make us a smallish run of 7075 T6 receiver sets. These will be delivered in Feb/Mar... pricing to be determined later as they have not quoted us yet.
For those thinking about the MK3; that is 6+ months away. The plan is to get these out, and stabilize before moving on.