Oh I'm sure I'll regret it, but I'll bite...
The current average wait is at 16 weeks, which is more loosely translated to 1/3rd of a year. We are trying to shorten lead times.
I know RDSC had ordered a small number of these, I assumed to retail or install on customized PC9's. That's about the only thing I can imagine is if you paid someone else to do the wait for you.
I’ll be happy for 16 weeks wait time. The last time I called the wait time for MWI hand guard was much longer than that. So if things are changed now I’ll order one with the hand guard and if that takes also 16 weeks or so that would be great. Thanks for the answer.