BlackSheepBrass
Regular
- Location
- Cobourg, Ontario
So I finally got to go pick up my new machine that I ordered in February. Commercial loading equipment has between a 3 month and 12 month lead time usually between ordering it and picking it up. That was a very long and expensive wait.
This machine is near identical to mine, however, mine has some upgrades on it to allow for slightly higher net output and increased reliability.
So it completes the same functions as the pistol case processor that I have, This machine does not trim, and it must be done on a separate machine.
Tasks completed
Full speed
Video slowed down
Now.... I just have to lift it out of the truck.... it weighs 300 pounds, and I do not have a forklift.
This machine is near identical to mine, however, mine has some upgrades on it to allow for slightly higher net output and increased reliability.
So it completes the same functions as the pistol case processor that I have, This machine does not trim, and it must be done on a separate machine.
Tasks completed
- Mouth rounded with carbide probe
- Berdan check
- Berdan eject
- Crack check
- Crack eject
- Deprime / partial resize
- Primer pocket check
- Full length resize / swage
- Ejection of completed brass.
Full speed
Video slowed down
Now.... I just have to lift it out of the truck.... it weighs 300 pounds, and I do not have a forklift.
Last edited:




















































