M305 & a CQa COMBO

Actually it was Brian Mulroney and the Progressive Conservative party with bill C-17

From Wikipedia

In 1991, Bill C-17 tightened up restrictions and established controls on numerous firearms with military background. Legislation also made changes to the FAC system. FAC applicants were now required to pass a firearms safety course, and a thorough background check, and wait a minimum of 28 days after applying for an FAC before being issued.

Finally, in addition to the above changes, laws were put into place that restricted ownership of high-capacity magazines: limiting handguns to ten rounds, and most semi-automatic centre-fire rifles to five rounds. Legislation was upheld by the Supreme Court in Reference re Firearms Act (2000). The FAC system was replaced with possession-only licences (POLs) and possession and acquisition licences (PALs). Referring to Bill C-68, John Dixon, a former advisor to Deputy Minister of Justice John C. Tait, stated that the Firearms Act was part of a policy exercise by the Liberal Party of Canada so as to appear to be "tougher" on guns than Prime Minister Kim Campbell, and thus defeat her in the 1993 election.[14]


Exactly, but let's not introduce facts into the whole false "left/right" paradigm!

Obama's anti-gun owner colleagues have done that....apparently ignoring Gallup data that says 2/5 Democrats are gun owners.
 
Two questions for you.

1. Will the rifles come with one, two or no cases?

2. Is it possible to ship the M305 first while waiting the eternity for the CQA to be processed by the powers that be?
 
Two questions for you.

1. Will the rifles come with one, two or no cases?

2. Is it possible to ship the M305 first while waiting the eternity for the CQA to be processed by the powers that be?

M-305 comes with case, the CQa does not
Marstar
 
hahaha aww shame it isn't the 10" AR and the 18" M305 :D

We go with popular demand, customers want the longer CQa, so that's what we have made....
As for the shorty M-305, we have explained several times, too many issues, we will not import at this time
Marstar
 
And 2. Is it possible to ship the M305 first while waiting the eternity for the CQA to be processed by the powers that be?

Or is it a case of saving on shipping costs?
 
Back
Top Bottom