Did anyone else pickup one of the NEA quad rails that SFRC was clearing out earlier this year?
I picked mine up this week and it looks like I can't get the rail on properly and lined up with the gas tube. It looks like the barrel nut at the 12 o'clock position has teeth where the gas tube sits and the rail won't go on straight. It uses a standard barrel nut. Once my camera charges I'll see if I can post a picture of the nut and how it sits into the rail. Before I get the barrel nut installed timed and take a dremel or file off the tooth at the 12 0'clock position I'd thought I'd ask first incase I'm doing it wrong or if there's a proper way to install the rail.
Thanks
I picked mine up this week and it looks like I can't get the rail on properly and lined up with the gas tube. It looks like the barrel nut at the 12 o'clock position has teeth where the gas tube sits and the rail won't go on straight. It uses a standard barrel nut. Once my camera charges I'll see if I can post a picture of the nut and how it sits into the rail. Before I get the barrel nut installed timed and take a dremel or file off the tooth at the 12 0'clock position I'd thought I'd ask first incase I'm doing it wrong or if there's a proper way to install the rail.
Thanks





















































