If the overall length specified for a specific load is 1.125, what would be the tolerance in thousandths of an inch? I have read plus or minus .005" of the target value is fine. Is this accurate? I reject at .002 and measure every load. Am I wasting time? All the loads are within .005" and I have done thousands.


















































